Serving New Braunfels and the Texas Hill Country Free written estimates

New Braunfels, Texas

Bathroom Remodeling in New Braunfels, TX

A bathroom is a small room with more trades per square foot than anywhere else in the house, and it is the room where shortcuts stay hidden the longest. Bad waterproofing behind a beautiful tile job does not announce itself for years.

Request a Consultation

Tell us about the project and we will walk the space.

Free written estimate. Or call (830) 555-0142.

  • 5.0Rated on Google
  • Hill CountryBased in New Braunfels
  • FreeWritten estimates
  • One teamFrom design to punch list
  • Fixed scopeWritten before work starts
Bathroom Remodeling work of the kind Norton Remodeling carries out in New Braunfels
Illustrative photography. Ask to see photographs of our own completed projects in New Braunfels.

What is included

What a Bathroom Remodeling Project Covers

Waterproofing

A proper waterproofing system behind the tile, detailed at the curb, corners and niche where failures start.

Tiled showers and tub surrounds

Set on a sound substrate with slope to the drain built correctly rather than corrected with grout.

Layout changes

Moving fixtures, widening a doorway, converting a tub to a walk-in shower, or reworking a cramped en suite.

Vanities, tops and fixtures

Supplied and set, or installed from your own selections.

Ventilation

Extraction that actually moves air outside the building, which is the difference between a dry bathroom and a mould problem.

Signs it is time

When This Work Is Worth Doing

  • Loose or hollow-sounding tile, or grout that keeps cracking in the same line
  • A shower pan that holds water, or a drain the floor slopes away from
  • Staining on the ceiling below an upstairs bathroom
  • A tub you step over and no longer use, taking up a third of the room
  • Persistent damp smell or peeling paint, usually a ventilation failure

How it runs

The Process

  1. 01

    Walk the space

    Check the substrate, the venting, and what is underneath if there is a floor below.

  2. 02

    Written scope and allowances

    Itemised, with allowances for tile, vanity, fixtures and glass.

  3. 03

    Demolition

    Strip to studs where the tile is coming out, which is also when concealed damage shows up.

  4. 04

    Rough-in and waterproofing

    Plumbing and electrical changes, inspection, then the waterproofing system and its dry time.

  5. 05

    Tile, fixtures and glass

    Tile set and grouted, fixtures fitted, then shower glass templated to the finished opening.

Options

Ways to Approach It

Refresh in place

New vanity, fixtures, paint and flooring with the existing shower left alone. Fastest and cheapest option.

Full wet-area rebuild

Shower or tub surround stripped to studs and rebuilt with new waterproofing. The right call if there is any sign of a leak.

Tub to walk-in shower

Popular in New Braunfels with owners planning to stay in the house long term. Involves drain relocation and, done properly, a curbless or low-curb entry.

Local context

Bathroom Remodeling in New Braunfels

Two New Braunfels patterns come up repeatedly. In older homes near downtown and along the river, original bathrooms were built with mortar beds and cast iron waste lines, and once the tile comes off the pipework is often at the end of its life, so the honest scope includes replacing it. In the newer subdivisions, the bathrooms are only fifteen to twenty five years old but were built to a builder price, and the typical failure is a shower pan or a poorly detailed corner leaking into the framing. Hard water is common across the area, which is hard on fixtures and glass and worth planning for in what you select.

What moves the price

Pricing Factors

  • Whether the wet area is rebuilt or left in place
  • Tile size and pattern, since large format and herringbone both add labour
  • Whether the drain moves, which on a slab means cutting concrete
  • Frameless glass, which is templated to the finished opening and priced accordingly
  • Concealed damage found once the old tile is out

Every estimate is itemised, with allowances written out so you can see which figures are fixed and which depend on selections.

Why Norton

Why New Braunfels Homeowners Choose Norton

The scope is written down before work starts

Most remodeling disputes come from a vague scope, not from bad craftsmanship. Every project begins with an itemised written estimate covering what is included, what is excluded, which materials are allowed for, and what happens if something unexpected appears behind a wall. You approve it before demolition, and changes are priced in writing as they arise.

One team, one point of contact

You are not passed between a salesperson, a coordinator, and three separate trades who each blame the last. The same people who quote the work run the work, which means the person answering your questions has actually been inside your house and knows what is behind the drywall.

Built for Hill Country homes

Comal County construction has specifics: expansive clay soils that move with the wet and dry cycle, slab-on-grade foundations that complicate plumbing reroutes, older homes near the river with additions that were never permitted, and newer builds where the original finish carpentry was rushed. Knowing which you are dealing with changes the plan.

5.0

Google verified reviews

Rated 5.0 by New Braunfels homeowners

Every review on the Google Business Profile for Norton Remodeling is from a real customer. We do not publish invented quotes, and we do not use stock photography of other companies' work.

Read the reviews on Google

Questions

Questions About Bathroom Remodeling

Can you make a curbless shower?

Usually, but it depends on the floor structure. On a slab it means recessing the drain area, and on a framed floor it means dropping the joists or building the rest of the floor up. Both are doable, both need to be priced honestly rather than promised on a walk-through.

How long does a bathroom take?

Two to four weeks on site for a full rebuild once materials are on hand. Waterproofing cure time and shower glass templating are the two fixed waits that cannot be compressed.

Do I need to replace the plumbing?

Not always. If the supply lines are copper or PEX in good condition, they stay. If we open a wall in an older home and find galvanised supply or cast iron waste that is corroding, replacing it while the wall is open costs a fraction of doing it later.

Will one bathroom out of action be a problem?

If it is your only bathroom, plan for it. We can stage the work to shorten the period the room is unusable, but there is a stretch during waterproofing and tile where it cannot be used at all.

Ready to talk about your bathroom remodeling?

Free written estimates across New Braunfels and the Texas Hill Country.